12/28/06 – Obtaining
the car
The frame rail width on the skyline and BMW is 27"
The distance from the firewall to the rear of the cross member/sway bar
is
~8" on both cars
The distance from the firewall to the front of the cross member/sway
bar is
~16" on both cars
This is the tight one: the Distance from the firewall to radiator
support on
the GTR is 40", while the same distance on the E30 is 33". EEP.
5
However, the RB26 is 31" long, back of engine to front of crank pulley.
The skyline radiator I have is 1.25 inches thick. This leaves 3/8 of
clearance
front and rear. Since the motor does not torque in this direction, I
think it
should be alright. If not, I can get a narrower radiator and put it
UNDER the
radiator support. (stock location is aft of it.)
The brake booster is definitely going to be a problem. To a lesser
extent, so
is the downpipe (damn LHD cars).
I've already stripped almost 100 lbs off of the chassis in the engine
bay
alone, and another 100 lbs+ off of the RB motor (Power Steering, Air
Conditioning, Front diferential, Twin turbos and cast manifolds).
This is my tentative plan for construction:
Strip Body
Build Exhaust and IC plumbing
New brake booster or remote mount
Build/buy driveshaft
Remove engine and all components. Strip to roller.
Shave firewall and engine bay.
Body work, paint, wheels
Paint engine covers, replace timing belt, thermostat and water pump
Reinstall engine and all plumbing
Rewire front half of car. Gauges?
Install race buckets. Possible bolt in cage.
Tune.
Mods: 7
RB26
GT35R @ 18psi
38mm tial WG
FMIC
Tial 50mm BOV
PFC or AEM. Ew. $$$ 6
Seats?
Cage?
The chassis itself was a
major project in itself. This
was never intended to be the case.
The car would be up and running had I not
needed to spend so much time on the chassis.
However, it was a huge learning experience, in a number of
ways. First, I
learned that if I am ever going to
do a project like this again and cleaner shells are available for only
a bit
more money, SPEND THE EXTRA MONEY TO GET IT.
Secondly, and more importantly, I learned (and am in the
midst of
learning) a LOT a about doing bodywork.
This is information that I can take with me to future
endeavors (such as
bastardizing muscle cars with import engines…). Also, I will
never start a project like this
without looking at the shell, thoroughly, in PERSON.
The current progress on the
tentative timeline:
Strip Body (done)
Mount Engine (done)
Build Exhaust and IC plumbing (done, still need to make a hanger or two)
New brake booster or remote mount (done)
Build/buy driveshaft (not done)
Remove engine and all components. Strip to roller. (definitely done)
Shave firewall and engine bay. (very soon)
Body work, paint, wheels (in process)
Paint engine covers, replace timing belt, thermostat and water pump
(not done)
Reinstall engine and all plumbing (not done)
Rewire front half of car. Gauges? (not done)
Install race buckets. Possible bolt in cage. (seats soon, cage done)
Tune. (done. Just
Kidding)
(1) Really hammering that point home…
(2) Ignorance is bliss…
(3) Make that the ENTIRE car.
(4) Or NO interior (at least for 08)
(5)
See
also: Eff
you mtech valence!!!
(6)
Needs
another dollar sign at least…
(7) The mod list is laughably short